SICIMONTAGGI boasts long-standing experience in extraordinary maintenance work (Turnaround), acting as a “GENERAL CONTRACTOR”, during general plant shutdowns lasting about a month, carried out in major oil and petrochemical plants both in Italy and whitin Europe.
STRENGTH
– Safety culture with high standards
– Training and professional development of staff at all levels
– Highly experienced staff
– High standards of quality culture
– Consolidated network with subcontractors for other disciplines
TARGET
Our target is to minimize our impact on the environment and protect our employees, customers and anyone who may be affected by our activities.
– Execution within the contractual schedule
– Price competitiveness
– High quality standards
– Work optimization
BID PHASE (Pre site survay)
Plant type information | Refinery layout | List of work to carry out and plant and equipment blinding diagrams | Equipment layout drawings (height, accessibility, particular types of material , etc.). | Materials list | Schedule | Quality requirement | HSE Requirements.
BID PHASE (Site Survay)
Utilities availability | Logistics assessment (temporary site facilities including laydown areas and work site)| Accessibility to facilities assessment |Control of possible interference with work performed by other companies |
BID PHASE (post site survay)
Definition of: Estimated quantities | estimated number of resources by discipline | estimated staff and site supervision | Estimated Work equipment Workforce (such as: cleaning machines, exchanger extractors, gear for confined space, cranes, truck, tools containers, etc..| Definition of Level 3 schedule (Primavera P6) with relevant S-CURVES within Client schedule| Comments to Body of Subcontract | Main Risk assessment |
MAIN TASK OF PROJECT START-UP:
KOM | project procedure | risk assemntent | method statements | HSE Plan | Quality control plan | Welding book | Preparation of Job Cards and associated PTW (permit to work) | quantity assesment | level 4 schedule with CPA identification and S-CURVES defining the skill and quantity of work-force required (task ID CODE with the same Job Card number)| Final site logistic plan | Preparation of Job Cards and associated PTW (permit to work) | etc..
MAIN TASK OF PRE-TURNAROUND:
Site preparation: set-up of temporary offices, dressing rooms, mess area and warehouse | set-up of laydown areas fencing | delivery and placing of tools and containers areas fencing | installation of electrical panels at the work site | installation of pedestrian path (from TSF to work site) | unloading of materials at laydown/warehouse areas (scaffolding, insulation materials, bulk material from client, hydro-jet cleaning equipment, etc..) | piping prefabrication and shipping to site | Scaffoldin erection | Collecting bulk material to be segregated by Job Card before TAR | etc..
MAIN TASK OF EXECUTION:
Daily toolbox meeting by the Project managment | LMRA before starts works on the work place | Staff schedule meeting (morning) to identify if any mitigation action are required | daily coordination meeting (post lunch time) to identify any SIMOPS and mitigate risks | Progress review daily meeting (Staff and Supervisor) | Schedule chasers will continuosly collect progress at site and report to planner | Quality control continuoselly inspection and reporting to Quality Manager | etc..